Data Sources
All calculations use the following config. Update the JSON files in src/lib/config/data and run npm run config:validate to refresh.
Synergy A1 (import & supply)
- Version:
- 1.1.0
- Last checked:
- 2026-04-27
- Notes
- Synergy A1 residential tariff. Updated using Synergy price changes published for 1 July 2025.
DEBS (feed-in)
- Version:
- 1.1.0
- Last checked:
- 2026-04-27
- Notes
- DEBS (Distributed Energy Buyback Scheme) feed-in rates for WA. Prices confirmed against Synergy DEBS schedule (correct as at 1 July 2025).
Perth assumptions (PSH, performance)
- Version:
- 1.0.1
- Last checked:
- 2026-04-27
- Notes
- Perth (WA) PSH and default assumptions. PSH from Bureau of Meteorology / CEC guidelines.
STC incentives
- Version:
- 1.0.1
- Last checked:
- 2026-04-27
- Notes
- Small-scale Technology Certificates. WA zones from CER. Scheme ends 2031. STC price conservative estimate.
Costs & emissions (system cost, CO2 factor)
- Version:
- 1.0.1
- Last checked:
- 2026-04-27
- Notes
- System cost per kW and CO2 factor for WA. Cost range is indicative; CO2 from WA grid emissions factor.
Battery CAPEX & VPP bonus (MVP assumptions)
- Version:
- 1.0.0
- Last checked:
- 2026-03-19
- Notes
- MVP battery CAPEX and VPP participation bonus placeholders. Update with your latest WA market quotes when needed.
Data sources: Bureau of Meteorology (BOM), Synergy WA rate schedules, Clean Energy Council performance standards.