Data Sources

All calculations use the following config. Update the JSON files in src/lib/config/data and run npm run config:validate to refresh.

  • Synergy A1 (import & supply)

    Version:
    1.1.0
    Last checked:
    2026-04-27
    Notes
    Synergy A1 residential tariff. Updated using Synergy price changes published for 1 July 2025.
  • DEBS (feed-in)

    Version:
    1.1.0
    Last checked:
    2026-04-27
    Notes
    DEBS (Distributed Energy Buyback Scheme) feed-in rates for WA. Prices confirmed against Synergy DEBS schedule (correct as at 1 July 2025).
  • Perth assumptions (PSH, performance)

    Version:
    1.0.1
    Last checked:
    2026-04-27
    Notes
    Perth (WA) PSH and default assumptions. PSH from Bureau of Meteorology / CEC guidelines.
  • STC incentives

    Version:
    1.0.1
    Last checked:
    2026-04-27
    Notes
    Small-scale Technology Certificates. WA zones from CER. Scheme ends 2031. STC price conservative estimate.
  • Costs & emissions (system cost, CO2 factor)

    Version:
    1.0.1
    Last checked:
    2026-04-27
    Notes
    System cost per kW and CO2 factor for WA. Cost range is indicative; CO2 from WA grid emissions factor.
  • Battery CAPEX & VPP bonus (MVP assumptions)

    Version:
    1.0.0
    Last checked:
    2026-03-19
    Notes
    MVP battery CAPEX and VPP participation bonus placeholders. Update with your latest WA market quotes when needed.

Data sources: Bureau of Meteorology (BOM), Synergy WA rate schedules, Clean Energy Council performance standards.